Direction: In the following passage some words have been deleted. Fill in the blanks with the help of the alternatives given. Select the most appropriate option for each blank. |
Trade on the New York Stock Exchange was (20) to a standstill on an autumn day (21) 1994. The culprit for the outage (22) a squirrel that had chewed through a power line near the computer centre of the (23) in Trumbull, Connecticut. The shutdown (24) lasted for half-an-hour, resulted in the NYSE operating at 85 percent capacity. |
A) town
B) store
C) exchange
D) bank
Correct Answer: C
You need to login to perform this action.
You will be redirected in
3 sec