SSC Sample Paper SSC CGL - Sample Paper-28

  • question_answer
    Direction: The pie chart given below shows the break-up of the cost of construction of a house. Assuming that the total cost of construction is 60000, answer the questions given below
    The amount spent on cement, steel and supervision is what per cent of the total cost of construction?

    A) 40%                             

    B) 45%     

    C) 50%     

    D) 55%

    Correct Answer: C

    Solution :

    Amount spent on cement, steel and supervision \[=\frac{(72+54+54)}{360}\times 100%\] \[\therefore \] Required percentage             \[=\frac{180}{360}\times 100%=50%\]              


You need to login to perform this action.
You will be redirected in 3 sec spinner