A) Creating necessary transmission systems
B) Installation of shunt capacitors
C) Renovation and Modernisation of transmission and distribution systems
D) All of the above
Correct Answer: C
Solution :
[c] Power System Development Fund (PSDF) will be utilised for creating necessary transmission systems of strategic importance based on operational feedback by Load Dispatch Centres for relieving congestion in Inter-state Transmission Systems. The fund will also be utilised towards installation of shunt capacitors, series compensators and other reactive energy generators for improvement of voltage profile in the grid, installation of standard and special protection schemes, pilot and demonstrative projects, and for setting right discrepancies identified in protection audits on regional basis and renovation and modernisation (R&M) of transmission and distribution systems for relieving congestion and any other scheme or project in furtherance of the above objectives, such as, conducting technical studies and capacity building.You need to login to perform this action.
You will be redirected in
3 sec