Railways NTPC (Technical Ability) Tool Engineering Question Bank Tool Engineering

  • question_answer
    Match List-I with List-II and select the correct answer using the codes given below the lists:
    List-I (O.K. technique) List-II (Application)
    A. Linear  programming 1. Warehouse location decision
    B. Transportation 2. Machine allocation decision
    C. Assignment 3. Product mix decision
    D. Queuing theory   4. Project management
    5. Number of servers decision
    Codes:

    A) A\[\to \]1, B\[\to \]2, C\[\to \]3, D\[\to \]5

    B) A\[\to \]3, B\[\to \]1, C\[\to \]2, D\[\to \]5

    C) A\[\to \]1, B\[\to \]3, C\[\to \]2, D\[\to \]5

    D) A\[\to \]3, B\[\to \]2, C\[\to \]1, D\[\to \]4

    Correct Answer: B


You need to login to perform this action.
You will be redirected in 3 sec spinner