    Two men and 7 boys can do a piece of work in 14 days, 3 men and 8 boys can do it in 11 days In how many days can 8 men and 6 boys do a work 3 times as much as the first ?

    A)  21

    B)  27

    C)  28

    D)  35

    E)  None of these

    Correct Answer: A