Railways NTPC (Technical Ability) Tool Engineering Question Bank Tool Engineering

  • question_answer
    Match List-I (Methods) with List-II (Applications) and select the correct answer using the codes given below the lists:
    List-I List-II
    A. Breakeven analysis 1. To provide different facility at different
    B. Transportation 2. To take action from among the paths with uncertainty.
    C. Assignment problem 3. To choose between different methods of Manufacture
    D. Decision tree       4. To determine the location of the additional plant                      
    Codes:

    A) A\[\to \]4, B\[\to \]3, C\[\to \]1, D\[\to \]2

    B) A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2

    C) A\[\to \]3, B\[\to \]4, C\[\to \]2, D\[\to \]1

    D) A\[\to \]4, B\[\to \]3, C\[\to \]2, D\[\to \]1

    Correct Answer: B