question_answer1)
For transporting materials over long distance with greater speed- which one of the following devices is most suitable?
A)
Motor vehicle done
clear
B)
Industrial vehicle done
clear
C)
Belt conveyor done
clear
D)
Roller conveyor done
clear
View Solution play_arrow
-
question_answer2)
Match List-I (Equipment) with List-II (Typical situations) and select the correct answer using the codes given below the lists:
List-I (Equipment) | List-II (Typical situations) |
A. | Conveyor | 1. | Driverless vehicle with varying path |
B. | Cranes | 2. | Vertical movement of materials |
C. | Industrial trucks | 3. | Varying paths of movement |
D. | Lifts | 4. | Movement of intermittent load |
| | 5. | Fixed route movement |
Codes:
A)
A\[\to \]1, B\[\to \]3, C\[\to \]2, D\[\to \]4 done
clear
B)
A\[\to \]5, B\[\to \]4, C\[\to \]3, D\[\to \]2 done
clear
C)
A\[\to \]1, B\[\to \]4, C\[\to \]3, D\[\to \]2 done
clear
D)
A\[\to \]5, B\[\to \]3, C\[\to \]2, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer3)
Johnson's rule is applicable for planning a job shop for:
A)
n machines and 2 jobs done
clear
B)
2 machines and n jobs done
clear
C)
n machines and n jobs done
clear
D)
1 machine and n jobs done
clear
View Solution play_arrow
-
question_answer4)
A work shift is for 8 hours duration; 30 minutes lunch break and two 15 minutes (each) tea breaks are allowed per shift. If products are to go out after assembly at the rate of 60 per shift, and total assembly time content for a product is 42 minutes, then minimum number of work stations needed is:
A)
8 done
clear
B)
12 done
clear
C)
6 done
clear
D)
5 done
clear
View Solution play_arrow
-
question_answer5)
The layout of ship-building industry should be:
A)
Process layout done
clear
B)
Group layout done
clear
C)
Fixed location layout done
clear
D)
Product layout done
clear
View Solution play_arrow
-
question_answer6)
Motions of limbs are through
1. Elbow |
2. Finger |
3. Hip |
4. Shoulder |
5. Wrist. |
What is the correct sequence in descending order of motion in terms of time and fatigue involved?
A)
\[3\,-\,4\,-\,1\,-\,5\,-\,2\] done
clear
B)
\[2\,-\,5\,-\,1\,-\,4\,-\,3\] done
clear
C)
\[5\,-\,2\,-\,3\,-\,1\,-\,4\] done
clear
D)
\[4\,-\,3\,-\,2\,-\,1\,-\,5\] done
clear
View Solution play_arrow
-
question_answer7)
Which of the following are the characteristics of job order production?
(1) High degree of production control is required |
(2) Division of labour is effective |
(3) Detailed schedule is needed for each component |
(4) A flexible layout is preferred |
Select the correct answer using the codes given below: |
Codes:
A)
1, 3 and 4 done
clear
B)
2 and 4 done
clear
C)
1 and 3 done
clear
D)
3 and 4 done
clear
View Solution play_arrow
-
question_answer8)
Which one of the following is the correct definition of critical ratio in scheduling?
A)
Demand time/supply lead time done
clear
B)
Supply lead time/demand time done
clear
C)
Demand time/manufacturing lead time done
clear
D)
Manufacturing lead time/demand time done
clear
View Solution play_arrow
-
question_answer9)
Several sequencing rules can be used to sequence jobs. The performance of these rules can be studied using several performance measures. Consider the following sequencing rules: SPT (Shortest Processing Time)EDD (Expected Due Date)and the following performance measures:
MFT (Mean Flow Time) |
ML (Mean Lateness) |
Which one of the following is not correct? |
A)
SPT minimizes MFT done
clear
B)
EDD minimizes MFT done
clear
C)
EDD minimizes ML done
clear
D)
SPT minimizes ML done
clear
View Solution play_arrow
-
question_answer10)
Which of the following factors necessitate a change in schedule?
1. Change in Board of Directors |
2. Capacity modification |
3. Lack of capital |
4. Unexpected rush orders |
Select the correct answer using the codes given below:
A)
2, 3 and 4 done
clear
B)
1, 2 and 5 done
clear
C)
2, 4 and 5 done
clear
D)
1, 3 and 4 done
clear
View Solution play_arrow
-
question_answer11)
Consider the following statements:
A process layout |
1. Has machines of same functions arranged in a place |
2. is suitable for batch production |
3. has machines of different functions arranged according to processing sequence |
4. is suitable for mass production. |
Of these statements:
A)
1 and 2 are correct done
clear
B)
3 and 4 are correct done
clear
C)
2 and 3 are correct done
clear
D)
1 and 4 are correct done
clear
View Solution play_arrow
-
question_answer12)
The layout suitable for the low demand and high variety products is:
A)
Group layout done
clear
B)
process layout done
clear
C)
Product layout done
clear
D)
static layout done
clear
View Solution play_arrow
-
question_answer13)
Which one of the following pairs is not correctly matched?
A)
Job production ... Process layout done
clear
B)
Mass production ... Product layout done
clear
C)
Job production ... Special purpose done
clear
D)
Job production ... Production purpose done
clear
View Solution play_arrow
-
question_answer14)
Dispatching function of production planning and control refers to:
A)
Dispatch of finished goods on order done
clear
B)
Movement of in-process material from shop to shop done
clear
C)
Authorizing a production work order to be launched done
clear
D)
Dispatch of bills and invoices to the customer done
clear
View Solution play_arrow
-
question_answer15)
Match List-I with List-II and select the correct answer using the codes given below the lists:
List-I | List-II |
A. | Just-In-Time inventory and Procurement Techniques | 1. | Intermittent Production |
B. | Work-In-Process likely to be low compared to Output | 2. | Repetitive Production |
C. | Scheduling Typically Most Complex process | 3. | Continuous Production |
D. | Flexible Manufacturing cell | 4. | Job Production |
Codes:
A)
A\[\to \]2, B\[\to \]3, C\[\to \]4, D\[\to \]1 done
clear
B)
A\[\to \]3, B\[\to \]2, C\[\to \]1, D\[\to \]4 done
clear
C)
A\[\to \]2, B\[\to \]3, C\[\to \]1, D\[\to \]4 done
clear
D)
A\[\to \]3, B\[\to \]2, C\[\to \]4, D\[\to \]1 done
clear
View Solution play_arrow
-
question_answer16)
Consider the following advantages:
1. Very flexible |
2. Simple to understand |
3. Detailed operation can be visualized |
Which of these are the advantages of master scheduling?
A)
1 and 2 done
clear
B)
1 and 3 done
clear
C)
2 and 3 done
clear
D)
1, 2 and 3 done
clear
View Solution play_arrow
-
question_answer17)
A set of requirement for a product layout m an industry is:
A)
General purpose machine and skilled labour done
clear
B)
Special purpose machine and skilled labour done
clear
C)
General purpose machine and unskilled labour done
clear
D)
Special purpose machine and semi-skilled labour done
clear
View Solution play_arrow
-
question_answer18)
Match List-I (Types of layout) with List-II (Uses) and select the correct answer using the codes given below the Lists:
List-I | List-II |
A. | Product Layout | 1. | Where a large quantity of products is to be produced |
B. | Process Layout | 2. | Where a large variety of products is manufactured |
C. | Combined Layout | 3. | Where item is being made in different types of sizes |
D. | Fixed Position Layout | 4. | Where too heavy or huge item is used as raw |
Codes:
A)
A\[\to \]1, B\[\to \]2, C\[\to \]3, D\[\to \]4 done
clear
B)
A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3 done
clear
C)
A\[\to \]1, B\[\to \]2, C\[\to \]4, D\[\to \]3 done
clear
D)
A\[\to \]2, B\[\to \]1, C\[\to \]3, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer19)
In which one of the following types of industrial activities, the problem of loading and scheduling becomes more difficult?
A)
Single-product continuous done
clear
B)
Multi-product continuous done
clear
C)
Batch production done
clear
D)
Continuous or process production done
clear
View Solution play_arrow
-
question_answer20)
The correct sequence of factors in order of decreasing importance for location of a thermal power plant is:
A)
Load, coal, water done
clear
B)
coal, water, load done
clear
C)
Water, load, coal done
clear
D)
water, coal, load done
clear
View Solution play_arrow
-
question_answer21)
For economic manufacture, the total annual cost is given as \[12M\left( P+\frac{D}{Q} \right);\] where
1. M is number of parts made per month |
2. P is processing cost per part. |
Which one of the following is represented by D/Q in the above expression? |
A)
Setting up cost done
clear
B)
profit per part done
clear
C)
Bonus done
clear
D)
setting up cost/part done
clear
View Solution play_arrow
-
question_answer22)
Consider the following statements;
In designing a plant layout, a "Product Layout" should be preferred if |
1. The variety of the products is low |
2. The variety of the products is very large |
3. The quantity of production is very small in each variety |
4. The quantity of production is very large in each variety |
5. The in-process inspection is maximum |
6. The in-process inspection is minimum. |
Which of the statements given above are correct?
A)
1, 3 and 6 done
clear
B)
1, 4 and 5 done
clear
C)
2, 3 and 5 done
clear
D)
1, 4 and 6 done
clear
View Solution play_arrow
-
question_answer23)
Consider the following:
1. Simplified production planning and control systems |
2. Reduced material handling |
3. Flexibility of equipment and personnel. |
The advantages of flow-line layout in manufacturing operation are:
A)
1, 2 and 3 done
clear
B)
1 and 2 done
clear
C)
2 and 3 done
clear
D)
1 and 3 done
clear
View Solution play_arrow
-
question_answer24)
Which of the following activities pertain to a master production schedule.
1. Sizing and timing of specific items, production lot |
2. Sequencing of individual orders of jobs |
3. Short term allocation of resources to individual operations |
4. Product design |
Select the correct answer using the code giver below:
A)
1, 2 and 4 done
clear
B)
2, 3 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
1, 2 and 3. done
clear
View Solution play_arrow
-
question_answer25)
Which one of the following forecasting techniques is not suited for making forecasts for planning production schedules in the short range?
A)
Moving average done
clear
B)
Exponential smoothing method done
clear
C)
Regression analysis done
clear
D)
Delphi method. done
clear
View Solution play_arrow
-
question_answer26)
Consider the following statements:
Queuing Theory is used for |
1. Inventory problems |
2. Traffic congestion studies |
3. Job-shop scheduling. |
Which of the statements given above are correct?
A)
1, 2 and 3 done
clear
B)
1 and 2 done
clear
C)
2 and 3 done
clear
D)
1 and 3 done
clear
View Solution play_arrow
-
question_answer27)
Which one of the following expressions given the rate depreciation by the straight line method? (C = initial cost, S = scrap value, N = life in years).
A)
\[D=(C\,-S)N\] done
clear
B)
\[D=(C\,+S)N\] done
clear
C)
\[D=C-S\] done
clear
D)
\[D=C+S\] done
clear
View Solution play_arrow
-
question_answer28)
On which of the following factors does selection of material handling equipment depend?
1. Cost |
2. Material characteristics |
3. Type of productions |
4. Equipment's available and their characteristics |
Select the correct answer using the code given below:
A)
1, 2, 3, and 4 done
clear
B)
2 and 3 done
clear
C)
1, 3 and 4 done
clear
D)
1, 2 and 4 done
clear
View Solution play_arrow
-
question_answer29)
Which of the following factors influence a plant layout?
1. Type of industry |
2. Type of machines |
3. Type of products |
4. Volume of production |
Select the correct answer using the code given below:
A)
2 and 3 done
clear
B)
1, 2 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
1 and 4 done
clear
View Solution play_arrow
-
question_answer30)
Maximum problems in scheduling are encountered in:
A)
Job type production done
clear
B)
Batch production done
clear
C)
Mass production done
clear
D)
Flow type production. done
clear
View Solution play_arrow
-
question_answer31)
A factory is producing 100 bolts and nuts per hour on a machine. Its material cost is Rs. 375, labour cost is Rs. 245 and the direct expense is Rs. 80. The factory on cost is 150% of the total labour cost. What is the total factory cost?
A)
Rs. 1067.50 done
clear
B)
Rs. 367.50 done
clear
C)
Rs. 320.25 done
clear
D)
Rs. 1387.75. done
clear
View Solution play_arrow
-
question_answer32)
Which of the following form the overhead expenses?
1. Factory expenses |
2. Material expenses |
3. Administrative expenses |
4. Sales and distribution expenses. |
Select the correct answer using the code given below;
A)
1, 2 and 3 done
clear
B)
1, 3 and 4 done
clear
C)
1 and 2 done
clear
D)
3 and 4 done
clear
View Solution play_arrow
-
question_answer33)
If the objective is to project the trend and seasonal variations in forecasting demand, then which is the appropriate model?
A)
Simple moving average done
clear
B)
Time series decomposition done
clear
C)
Weighted moving average done
clear
D)
Double exponential smoothing. done
clear
View Solution play_arrow
-
question_answer34)
Which one of the following is not an advantage of a product layout?
A)
Reduced martial handling done
clear
B)
Better utilization of machines and men done
clear
C)
Less floor area is occupied by the material in transit and for temporary storage done
clear
D)
Less capital investment. done
clear
View Solution play_arrow
-
question_answer35)
Which one of the following factors does not affect the plant location decision:
A)
Organization's objectives done
clear
B)
Resources done
clear
C)
Socio-economic environment done
clear
D)
Organizational structure. done
clear
View Solution play_arrow
-
question_answer36)
Which one of the following is the bask objective of a good plant layout?
A)
New plant construction done
clear
B)
Better use of labour done
clear
C)
Improvement in production process as a whole done
clear
D)
To meet customer's expectations. done
clear
View Solution play_arrow
-
question_answer37)
Match List-I (Material to be Handled) with List-II (Appropriate Material Handling Equipment) and select the correct answer using the code given below the lists:
List-I (Material to Handled) | List-II (Appropriate be Material Handling Equipment) |
A. | Large Castings | 1. | Screw Conveyor |
B. | Granular Material | 2. | Belt Conveyor |
C. | Auto Engine Block | 3. | Overhead Crane |
D. | Small Engine Parts | 4. | Roller Conveyor |
Codes:
A)
A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3 done
clear
B)
A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2 done
clear
C)
A\[\to \]2, B\[\to \]4, C\[\to \]1, D\[\to \]3 done
clear
D)
A\[\to \]3, B\[\to \]1, C\[\to \]4, D\[\to \]2 done
clear
View Solution play_arrow
-
question_answer38)
Which one of the following systems combines microelectronics and, mechanical engine to bring economics of scale to batch production?
A)
Job-shop production done
clear
B)
Group technology done
clear
C)
Flexible manufacturing done
clear
D)
Production. done
clear
View Solution play_arrow
-
question_answer39)
Match List-I with List-II and select the correct answer using the code given below the lists:
List-I (Plant Layout) | List-II (Characteristic Use) |
A. | Fixed Position | 1. | Avoids back tracking |
B. | Functional Layout | 2. | Ship building |
C. | Product Layout | 3. | Machines performing similar operations are grouped together |
D. | Process Layout | 4. | Helps in reducing total production time |
Codes:
A)
A\[\to \]2, B\[\to \]4, C\[\to \]3, D\[\to \]1 done
clear
B)
A\[\to \]1, B\[\to \]3, C\[\to \]4, D\[\to \]2 done
clear
C)
A\[\to \]1, B\[\to \]4, C\[\to \]3, D\[\to \]2 done
clear
D)
A\[\to \]2, B\[\to \]3, C\[\to \]4, D\[\to \]1 done
clear
View Solution play_arrow
-
question_answer40)
In case of mutually exclusive projects, which one is the most suitable criterion for evaluation of projects?
A)
Net Present Value done
clear
B)
Payback Period done
clear
C)
Internal Rate of Return done
clear
D)
Rate of Return done
clear
View Solution play_arrow
-
question_answer41)
In a low volume production, the dispatching function is not concerned with issuing of which one of the following?
A)
Work tickets done
clear
B)
Requisition of raw materials, parts and components done
clear
C)
Route sheets to production supervisor done
clear
D)
Requisition of tools and facilities done
clear
View Solution play_arrow
-
question_answer42)
Which of the following are the objectives of scheduling?
1. Reducing average waiting time of a batch |
2. To meet the deadline of order fulfillment |
3. To improve quality of products |
4. To increase facility utilization |
Select the correct answer using the code given below:
A)
1, 2 and 4 done
clear
B)
2, 3 and 4 done
clear
C)
1, 2 and 3 done
clear
D)
1 and 3 only done
clear
View Solution play_arrow
-
question_answer43)
Which of the following are needed as the input data for materials requirement planning?
1. Weekly production schedule |
2. Bill of material |
3. Supplier lead time |
4. Market forecast. |
Select the correct answer using the code given below:
A)
1, 2 and 3 done
clear
B)
2, 3, and 4 done
clear
C)
1 and 4 done
clear
D)
1, 2, 3 and 4 done
clear
View Solution play_arrow
-
question_answer44)
Consider the following statements:
Method study is carried out to achieve |
1. the most effective use of plant and equipment |
2. the most effective use of human efforts |
3. Evaluation of human work. |
Which of the statements given above are correct?
A)
1 and 3 only done
clear
B)
2 and 3 only done
clear
C)
1 and 2 only done
clear
D)
1, 2 and 3 done
clear
View Solution play_arrow
-
question_answer45)
Match List-I with List-II and select the correct answer using the code given below the lists:
List-I (Purpose of Transportation) | List-II (Device) |
A. | Coal from the pit to surface | 1. | Bucket elevator |
B. | Lump and powder material in bulk transportation to | 2. | Belt conveyor |
C. | Stacking components in store | 3. | Fork lift truck |
D. | Heavy material transportation in machine shop | 4. | Crane |
Codes:
A)
A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2 done
clear
B)
A\[\to \]1, B\[\to \]2, C\[\to \]3, D\[\to \]4 done
clear
C)
A\[\to \]3, B\[\to \]2, C\[\to \]1, D\[\to \]4 done
clear
D)
A\[\to \]1, B\[\to \]4, C\[\to \]3, D\[\to \]2 done
clear
View Solution play_arrow
-
question_answer46)
Consider the following statements:
1. The manufacturing equipment used in batch production is general-purpose but designed for higher rates of production |
2. The machine tools used in batch manufacture are not combined with specially designed jigs and fixtures. |
Which of the statements given above is/are correct?
A)
1 only done
clear
B)
2 only done
clear
C)
Both 1 and 2 done
clear
D)
neither 1 nor 2 done
clear
View Solution play_arrow
-
question_answer47)
Which one of the following is not a necessary information input to Material Requirements Planning?
A)
Inventory on hand done
clear
B)
Bill of materials done
clear
C)
Sequence of operations on a job done
clear
D)
Master production schedule (MPS). done
clear
View Solution play_arrow
-
question_answer48)
Break-even analysis can be used for which of the following?
1. Profit analysis |
2. Production method cost comparison. |
Select the correct answer using the code given below:
A)
1 only done
clear
B)
2 only done
clear
C)
Both 1 and 2 done
clear
D)
neither 1 nor 2 done
clear
View Solution play_arrow
-
question_answer49)
The factory overhead rate is 125% and direct labour cost for a job is Rs. 900. What is the factor overhead charge?
A)
Rs. 360 done
clear
B)
Rs. 720 done
clear
C)
Rs.1125 done
clear
D)
Rs. 2250 done
clear
View Solution play_arrow
-
question_answer50)
A certain part is produced in a batch size of 50 units and requires a sequence of 8 operations in the plant. The average set-up time and average non-operation time per operation are3 hours and 7 hours, respectively. The average operative time per machine per part is 6 minutes. What is the manufacturing lead time?
A)
100 hours done
clear
B)
120 hours done
clear
C)
150 hours done
clear
D)
180 hours done
clear
View Solution play_arrow
-
question_answer51)
Consider the following statements:
1. In product-flow layout, the arrangement of facilities within the plant is relatively inflexible. |
2. Process layout is typical in job shops and batch production. |
Which of the statements given above is/are correct?
A)
1 only done
clear
B)
2 only done
clear
C)
Both 1 and 2 done
clear
D)
neither 1 nor 2 done
clear
View Solution play_arrow
-
question_answer52)
A factory producing 150 electric bulbs a day, involves direct material cost of Rs. 250, direct labour cost of Rs. 200 and factory overheads of Rs. 225. Assuming a profit of 10% of the selling price, and selling on-cost 30% of the factory cost, what is the selling price of one electric bulb?
A)
Rs. 6.50 done
clear
B)
Rs. 12.50 done
clear
C)
Rs. 18.50 done
clear
D)
Rs. 21.00 done
clear
View Solution play_arrow
-
question_answer53)
Consider the following statements in respect of operations planning:
1. Aggregate planning addresses the supply side of the firm's ability to meet the demand |
2. The purpose of Master Productions Scheduling (MPS) is to meet the demand for individual products in the product group |
Which of the statements given above s/are correct?
A)
1 only done
clear
B)
2 only done
clear
C)
Both 1 and 2 done
clear
D)
neither 1 nor 2 done
clear
View Solution play_arrow
-
question_answer54)
Consider the following steps in a line balancing problem:
1. Apply an assignment heuristic to assign tasks to each work station |
2. Identify the precedence requirements |
3. Calculate the required minimum number of work stations. |
Which one of the following is the correct sequence of the above steps?
A)
\[2-3-1\] done
clear
B)
\[1-2-3\] done
clear
C)
\[2-1-3\] done
clear
D)
\[1-3-2\] done
clear
View Solution play_arrow
-
question_answer55)
Which of the following is/are advantage(s) of cellular manufacture?
1. Lower work-in-progress inventories |
2. Fewer tooling changes |
Select the correct answer using the code given below:
A)
1 only done
clear
B)
2 only done
clear
C)
Both 1 and 2 done
clear
D)
neither 1 nor 2 done
clear
View Solution play_arrow
-
question_answer56)
The constant factor in case of R 10 series of preferred number / is:
A)
1.6 done
clear
B)
1.25 done
clear
C)
1.12 done
clear
D)
1.03 done
clear
View Solution play_arrow
-
question_answer57)
Which grade symbol represents surface roughness of broaching?
A)
\[{{N}_{12}}\] done
clear
B)
\[{{N}_{3}}\] done
clear
C)
\[{{N}_{4}}\] done
clear
D)
\[{{N}_{1}}\] done
clear
View Solution play_arrow
-
question_answer58)
The minimum attractive rate return is different for various types of projects. All of the following factors will affect the minimum attractive rate of return for a new project except:
A)
The amount of capital that is available in the retained earnings done
clear
B)
The interest paid on capital, which is obtained through debt financing done
clear
C)
The rates used be the lending institutions or other firms done
clear
D)
None of the above. done
clear
View Solution play_arrow
-
question_answer59)
A piece of equipment has been purchased by the city for Rs. 10,000 with an anticipated salvage at Rs. 500 after 8 years. Which of the depreciation models will yield the greatest reduction in the book value of the equipment?
A)
Straight line depreciation done
clear
B)
Sum-of-years digits depreciation done
clear
C)
Declining balance depreciation done
clear
D)
Declining balance depreciation is switched to straight line. done
clear
View Solution play_arrow
-
question_answer60)
Which one of the following correctly explains process capability?
A)
Maximum capacity of the machine done
clear
B)
Mean value of the measured variable done
clear
C)
Lead time of the process done
clear
D)
Maximum deviation of the measured variables of the components done
clear
View Solution play_arrow
-
question_answer61)
61. A dealer sells a radio set at Rs. 900 and makes 80% profit on his investment. It he can sell it at Rs. 200 more, his profit as percentage of investment will be;
A)
160 done
clear
B)
180 done
clear
C)
100 done
clear
D)
120 done
clear
View Solution play_arrow
-
question_answer62)
Match List-1 with List-II and select the correct answer using the code given below the lists:
List-I (Contribution) | List-II (Contributor) |
A. | Specialization of Labour in Manufacturing | 1. | Henry Gantt |
B. | Scheduling techniques | 2. | George Dantzig |
C. | Linear Programming | 3. | Adam Smith |
D. | Quality and Productivity Applications from Japan | 4. | W.E. Deming |
Codes:
A)
A\[\to \]3, B\[\to \]4, C\[\to \]2, D\[\to \]1 done
clear
B)
A\[\to \]2, B\[\to \]1, C\[\to \]3, D\[\to \]4 done
clear
C)
A\[\to \]4, B\[\to \]3, C\[\to \]1, D\[\to \]2 done
clear
D)
A\[\to \]2, B\[\to \]4, C\[\to \]3, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer63)
In thermal power plants, coal is transferred from bucker to the other places by:
A)
Hoists done
clear
B)
conveyors done
clear
C)
Cranes done
clear
D)
lifts done
clear
View Solution play_arrow
-
question_answer64)
Production scheduling is simpler, and high volume of output and high labour efficiency are achieved in the case of:
A)
Fixed position layout done
clear
B)
Process layout done
clear
C)
Product layout done
clear
D)
A combination of line process layout done
clear
View Solution play_arrow
-
question_answer65)
Consider the following features/characteristics:
1. Need for greater variety of skills in labour |
2. Intermittent flow of materials and parts |
3. Preference for flexible layout |
The characteristics of job order layout would include:
A)
1, 2 and 3 done
clear
B)
1 and 2 done
clear
C)
2 and 3 done
clear
D)
1 and 3 done
clear
View Solution play_arrow
-
question_answer66)
Air cargo movements fall under:
A)
Fixed path system done
clear
B)
Continuous system done
clear
C)
Intermittent system done
clear
D)
Variable path system done
clear
View Solution play_arrow
-
question_answer67)
Match List-I with List-II and select the correct answer using the codes given below the lists:
List-I (Equipment) | List-II (Application) |
A. | Hoist | 1. | For moving over a fixed route |
B. | Conveyor | 2. | For transporting material over a varying path |
C. | Fork truck | 3. | For vertically raising or lowering material in a fixed location |
D. | Elevators | 4. | For overhead lifting of loads in fixed area |
| 5. | For moving persons up or down |
Codes:
A)
A\[\to \]4, B\[\to \]2, C\[\to \]3, D\[\to \]5 done
clear
B)
A\[\to \]2, B\[\to \]3, C\[\to \]4, D\[\to \]5 done
clear
C)
A\[\to \]4, B\[\to \]1, C\[\to \]2, D\[\to \]3 done
clear
D)
A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3 done
clear
View Solution play_arrow
-
question_answer68)
Consider the following situations that would warrant a study of the layout:
1. Change in the work force |
2. Change in production volume |
3. Change in product design |
4. Competition in the market |
The situation (s) that would lead to a change in the layout-would include:
A)
1, 2, 3 and 4 done
clear
B)
1, 3 and 4 done
clear
C)
3 alone done
clear
D)
2 alone done
clear
View Solution play_arrow
-
question_answer69)
Match List-I with List-II and select the correct answer using the codes given below the lists:
List-I (Products) | List-II (Factors for site selection) |
A. | Aluminium | 1. | Transporation Cost |
B. | Photographic Material | 2. | Skilled Labour |
C. | Cement | 3. | Abundance of power |
D. | Jigs and Fixtures | 4. | Climatic Conditions |
Codes:
A)
A\[\to \]2, B\[\to \]4, C\[\to \]1, D\[\to \]3 done
clear
B)
A\[\to \]3, B\[\to \]4, C\[\to \]1, D\[\to \]2 done
clear
C)
A\[\to \]1, B\[\to \]2, C\[\to \]4, D\[\to \]3 done
clear
D)
A\[\to \]4, B\[\to \]3, C\[\to \]1, D\[\to \]2 done
clear
View Solution play_arrow
-
question_answer70)
A device used for lifting of lowering objects suspended from a hook at the end of retractable chains or cable is called:
A)
Hoist done
clear
B)
jib crane done
clear
C)
Portable elevator done
clear
D)
chain conveyor done
clear
View Solution play_arrow
-
question_answer71)
Production cost refers to prime cost phis:
A)
Factory overheads done
clear
B)
Factory and administration overheads done
clear
C)
Factory, administration and sales overheads done
clear
D)
Factory, administration and sales overheads and profit. done
clear
View Solution play_arrow
-
question_answer72)
For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break-even r production per month will be:
A)
300 done
clear
B)
460 done
clear
C)
500 done
clear
D)
10000 done
clear
View Solution play_arrow
-
question_answer73)
Which one of the following methods can be used for forecasting the sales potential of a new product?
A)
Time Series Analysis done
clear
B)
Jury of Executive Opinion Method done
clear
C)
Sales Force Composite Method done
clear
D)
Direct Survey Method done
clear
View Solution play_arrow
-
question_answer74)
Which of the following charts are used for plant layout design?
1. Operation process chart |
2. Man machine chart |
3. Correlation chart |
4. Travel chart |
Select the correct answer using the codes given below:
A)
1, 2, 3 and 4 done
clear
B)
1, 2 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
2 and 3 done
clear
View Solution play_arrow
-
question_answer75)
In manufacturing management, the term "Despatching" is used to describe:
A)
Despatch of sales order done
clear
B)
Despatch of factory mail done
clear
C)
Despatch of finished product to the user done
clear
D)
Despatch of work orders through shop floor. done
clear
View Solution play_arrow
-
question_answer76)
Which of the following factors are to be considered for production scheduling?
1. Sales forecast |
2. Component design |
3. Route sheet |
4. Time standards |
Select the correct answer using the codes given below: |
Codes:
A)
1, 2 and 3 done
clear
B)
1, 2 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
2, 3 and 4 done
clear
View Solution play_arrow
-
question_answer77)
A device for lifting or lowering objects suspended from a hook at the end of a retractable chain or cable is called:
A)
Hoist done
clear
B)
Jib crane done
clear
C)
Chain conveyor done
clear
D)
Elevator done
clear
View Solution play_arrow
-
question_answer78)
Which one of the following software packages is used for plant layout?
A)
SIMSCRIPT done
clear
B)
DYNAMO done
clear
C)
CRAFT done
clear
D)
MRP done
clear
View Solution play_arrow
-
question_answer79)
The routing function in a production system design is concerned with:
A)
Manpower utilization done
clear
B)
Machine un-utilization done
clear
C)
Quality assurance of the product done
clear
D)
Optimising material flow through the plan done
clear
View Solution play_arrow
-
question_answer80)
Match List-I (type of Products) with. List-II (type of layout) and select the correct answer.
List-I | List-II |
A. | Ball Bearings | 1. | Process Layout. |
B. | Tools and Gauges | 2. | Product Layout |
C | Large Boilers | 3. | Combination of Product and Process layout |
D. | Motor cycle assembly | 4. | Fixed Position Layout. |
Codes:
A)
A\[\to \]1, B\[\to \]3, C\[\to \]4, D\[\to \]2 done
clear
B)
A\[\to \]3, B\[\to \]1, C\[\to \]4, D\[\to \]2 done
clear
C)
A\[\to \]1, B\[\to \]2, C\[\to \]4, D\[\to \]3 done
clear
D)
A\[\to \]3, B\[\to \]1, C\[\to \]2, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer81)
Which of the following are the principles of material handling?
1. Keep all handling to the minimum |
2. Move as few pieces as possible in one unit |
3. Move the heaviest weight to the least distance |
4. Select only efficient handling equipment |
Select the correct answer using the codes given below:
A)
1, 2, 3 and 4 done
clear
B)
1, 3 and 4 done
clear
C)
1, 2 and 3 done
clear
D)
2 and 4 done
clear
View Solution play_arrow
-
question_answer82)
Match List-I with List-II and select the correct answer using the codes given below the Lists.
List-I (Topic) | List-II (Method of solving) |
A. | Forecasting | 1. | North-West comer Method |
B. | Linear Programming | 2. | Rowan Plan |
C. | Wage Incentive | 3. | Method of penalty |
D. | Work Measurement | 4. | Time series Analysis |
| 5. | Work Factor System |
Codes:
A)
A\[\to \]4, B\[\to \]3, C\[\to \]1, D\[\to \]5 done
clear
B)
A\[\to \]4, B\[\to \]1, C\[\to \]5, D\[\to \]3 done
clear
C)
A\[\to \]4, B\[\to \]3, C\[\to \]2, D\[\to \]5 done
clear
D)
A\[\to \]3, B\[\to \]1, C\[\to \]2, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer83)
Given
T = underlying trend, |
C = cyclic variations within the trend |
S = seasonal variation within the trend and |
R = residual, remaining or random variation, as per the time series analysis of sales forecasting, the demand will be a function of |
A)
T and C done
clear
B)
R and S done
clear
C)
T, C and S done
clear
D)
T, C, S and R done
clear
View Solution play_arrow
-
question_answer84)
A production line is said to be balanced when:
A)
There are equal number of machines at each work station done
clear
B)
There are equal number of operators at each work station done
clear
C)
The waiting time for service at each station is the same done
clear
D)
The operation time at each station is the same. done
clear
View Solution play_arrow
-
question_answer85)
Consider the data given in the following table:
Prod-duction plan Period | Demand | Regular Prod. | Overtime Prod. | Others |
1 | 500 | 500 | ? | ? |
2 | 650 | 650 | 150 | ? |
3 | 800 | 650 | 150 | ? |
4 | 900 | 650 | 150 | 7 |
Give the fact that production in regular and overtime is limited to 650 and 150 respectively, the balance demand of 100 units in the 4th period can be met by:
A)
Using overtime in period 2 done
clear
B)
Using regular production in period 1 done
clear
C)
Subcontracting done
clear
D)
Using any of the steps indicated in A, B and C done
clear
View Solution play_arrow
-
question_answer86)
Based on the given graph figure, the economic range of batch sizes to be preferred for general purpose machine (GP). NC machine (NC) and special purpose (SP) will be:

Codes:
A)
GP\[\to \]2, NC\[\to \]5, SP\[\to \]4 done
clear
B)
GP\[\to \]1, NC\[\to \]4, SP\[\to \]5 done
clear
C)
GP\[\to \]3, NC\[\to \]2, SP\[\to \]4 done
clear
D)
GP\[\to \]1, NC\[\to \]4, SP\[\to \]2 done
clear
View Solution play_arrow
-
question_answer87)
Details of cost for make or buy decision are shown in the given graph figure. A discount is offered for a volume of purchase above 'V. Which one of the following ranges would lead to the economic decision?
A)
B)
C)
D)
View Solution play_arrow
-
question_answer88)
What term is used to designate the direction of the pre-dominant surface pattern produced by machining operation?
A)
Roughness done
clear
B)
lay done
clear
C)
Waviness done
clear
D)
cut-off done
clear
View Solution play_arrow
-
question_answer89)
Which one of the following is a qualitative technique of demand forecasting?
A)
Correlation and regression analysis done
clear
B)
Moving average method done
clear
C)
Delphi technique done
clear
D)
Exponential smoothing. done
clear
View Solution play_arrow
-
question_answer90)
Match List-I (Methods) with List-II (Problems) and select the correct answer using the codes given below the lists.
List-I | List-II |
A. | Moving Average | 1. | Assembly |
B. | Line Balancing | 2. | Purchase |
C. | Economic Batch Size | 3. | Forecasting |
D. | Johnson alogorithm | 4. | Sequencing |
Codes:
A)
A\[\to \]1, B\[\to \]3, C\[\to \]2, D\[\to \]4 done
clear
B)
A\[\to \]1, B\[\to \]3, C\[\to \]4, D\[\to \]2 done
clear
C)
A\[\to \]3, B\[\to \]1, C\[\to \]4, D\[\to \]2 done
clear
D)
A\[\to \]3, B\[\to \]1, C\[\to \]2, D\[\to \]4 done
clear
View Solution play_arrow
-
question_answer91)
Consider the following statements:
Dispatching |
1. Is the action of operations, planning and control |
2. Releases work to the operating divisions |
3. Convey instructions to the shop floor. |
Of these statements:
A)
1, 2 and 3 are correct done
clear
B)
1 and 2 are correct done
clear
C)
2 and 3 are correct done
clear
D)
1 and 3 are correct done
clear
View Solution play_arrow
-
question_answer92)
Which of the following are the benefits of assembly line balancing?
1. It minimises the in-process inventory |
2. It reduces the work content |
3. It smoothens the production flow |
4. It maintains the required rate of output |
Select the correct answer using the codes given below: |
Codes:
A)
1, 2 and 3 done
clear
B)
2, 3 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
1, 2 and 4 done
clear
View Solution play_arrow
-
question_answer93)
The characteristic life-cycle of a product consists of four periods. The rate of consumption increases rapidly at the beginning of the:
A)
Incubation period done
clear
B)
growth period done
clear
C)
Maturity period done
clear
D)
decline period done
clear
View Solution play_arrow
-
question_answer94)
Which one of the following tolerances set on inner diameter and outer diameter respectively of headed jig bush for press fit is correct?
A)
G7h6 done
clear
B)
F7h6 done
clear
C)
H7h6 done
clear
D)
F7J6 done
clear
View Solution play_arrow
-
question_answer95)
Which of the following input data are needed for MRP?
1. Master production schedule |
2. Inventory position |
3. Machine capacity |
4. Bill of materials |
Select the correct answer using the codes given below:
A)
1, 2 and 3 done
clear
B)
2, 3 and 4 done
clear
C)
1, 2 and 4 done
clear
D)
1, 3 and 4 done
clear
View Solution play_arrow
-
question_answer96)
The type of layout suitable for use of the concept, principles and approaches of 'group technology' is:
A)
Product layout done
clear
B)
Job-shop layout done
clear
C)
Fixed position layout done
clear
D)
Cellular layout done
clear
View Solution play_arrow
-
question_answer97)
A linkage is shown below in the figure in which links ABC and DBF are ternary links whereas AF, BE and CD are binary links.

The degrees of freedom of the linkage when link ABC is fixed are:
A)
0 done
clear
B)
1 done
clear
C)
2 done
clear
D)
3 done
clear
View Solution play_arrow
-
question_answer98)
A operations consultant for an automatic car wash wishes to plan for enough capacity to handle 60 cars hour. Each car will have wash time of 2 minutes, but there is to be a 20 per cent allowance for setup, delays and payment transactions. The installation capacity of car wash stalls should be:
A)
3 done
clear
B)
4 done
clear
C)
5 done
clear
D)
6 done
clear
View Solution play_arrow
-
question_answer99)
A company intends to use exponential smoothing technique for making a forecast for one of its products. The previous year's forecast has been 78 units and the actual demand for the corresponding period turned out to be 73 units. If the value of the smothering constant a is 0.2, the forecast for the next period will be:
A)
73 units done
clear
B)
75 units done
clear
C)
77 units done
clear
D)
78 units done
clear
View Solution play_arrow
-
question_answer100)
Which one of following statements is correct in relation to production, planning and control? Expediting initiates the execution of production plans, whereas dispatching maintains them and sees them through to their successful completion:
A)
Dispatching initiates the execution of production plans, whereas expediting maintains done
clear
B)
Them and sees through to their successful completion done
clear
C)
Both dispatching and expediting initiate the execution of production plans done
clear
D)
Both dispatching and expediting maintain the production plans and see them through to their successful completion. done
clear
View Solution play_arrow
-
question_answer101)
Consider the following statements regarding plant location and plant layout:
1. Qualitative factor analysis is a method of evaluating a potential location without applying quantitative values to the decision criteria |
2. The three determinants of the type of layout are type of product, type of process and the volume of production |
3. An appliance manufacturing plant where products are made on assembly lines would be classified as job shop type of layout. |
Which of these statements is/are correct?
A)
1, 2 and 3 done
clear
B)
1 and 2 done
clear
C)
2 alone done
clear
D)
3 alone done
clear
View Solution play_arrow
-
question_answer102)
Routing in production planning and control refers to be:
A)
Balancing of load on machines done
clear
B)
Authorization of work to be performed done
clear
C)
Progress or work performed done
clear
D)
Sequence of operations to be performed done
clear
View Solution play_arrow
-
question_answer103)
A production system has a product type of layout in which there are four machines laid in series. Each machine does a separate operation. Every product needs all the four operations to be carried out. The designed capacity of each of the four machines is 200, 175, 160 and 210 products per day. The system capacity would be:
A)
210 products per day done
clear
B)
200 products per day done
clear
C)
175 products per day done
clear
D)
160 products per day done
clear
View Solution play_arrow
-
question_answer104)
In production, planning and control, the document which authorizes the start of an operation on the shop floor is the:
A)
Dispatch order done
clear
B)
Route plan done
clear
C)
Loading chart done
clear
D)
Schedule done
clear
View Solution play_arrow
-
question_answer105)
During manufacture of cement, the handling of limestone is done by:
A)
Belt conveyor done
clear
B)
Bucket conveyor done
clear
C)
Overhead came done
clear
D)
Fork-lift crane. done
clear
View Solution play_arrow
-
question_answer106)
Which one of the following combinations is valid for product layout?
A)
General purpose machine and skilled labour done
clear
B)
General purpose machine and unskilled labour done
clear
C)
Special purpose machine and semi-skilled labour done
clear
D)
Special purpose machine and skilled labour done
clear
View Solution play_arrow
-
question_answer107)
Dispatching function of production, planning and control is:
A)
The dispatch of finished goods on order done
clear
B)
The movement of in-process material form shop to shop done
clear
C)
Authorizing a production work order to be launched done
clear
D)
The dispatch of bills and invoice to the customers. done
clear
View Solution play_arrow
-
question_answer108)
Match List-I (Files in MRP) with List-II (Inputs required) and select the correct answer using the codes given below the lists:
List-I (Files in MRP) | List-II (Inputs required) |
A. | Master Production Schedule | 1. | Scheduled Receipts |
B. | Bills of Materials | 2. | Unit Costs and Discounts |
C. | Inventory Records | 3. | Production Capacity |
D. | | 4. | Product Structure |
Codes:
A)
A\[\to \]4, B\[\to \]1, C\[\to \]3 done
clear
B)
A\[\to \]3, B\[\to \]4, C\[\to \]2 done
clear
C)
A\[\to \]3, B\[\to \]4, C\[\to \]1 done
clear
D)
A\[\to \]4, B\[\to \]3, C\[\to \]1 done
clear
View Solution play_arrow
-
question_answer109)
The proper sequence of activities for material requirement planning are:
A)
Master production schedule, capacity planning, MRP and order release done
clear
B)
Order release, master production schedule, MRP and capacity planning done
clear
C)
Master production schedule, order release, capacity planning and MRP done
clear
D)
Capacity planning, master production schedule, MRP and order release. done
clear
View Solution play_arrow
-
question_answer110)
Which one of the following is true in respect of production control for continuous or assembly line production?
A)
Control is achieved by PERT network done
clear
B)
Johnson algorithm is used for sequencing done
clear
C)
Control is on one work centre only done
clear
D)
Control is on flow of identical components through several operations. done
clear
View Solution play_arrow
-
question_answer111)
Which one of the following is the preferred logical sequence in the development of a new product?
A)
Technical feasibility, social acceptability and economic viability done
clear
B)
Social acceptability, economic viability and technical feasibility done
clear
C)
Economic viability, social acceptability and technical feasibility done
clear
D)
Technical feasibility, economic viability and social acceptability. done
clear
View Solution play_arrow
-
question_answer112)
Which one of the following methods can be used for forecasting when a demand pattern is consistently increasing or decreasing?
A)
Regression analysis done
clear
B)
Moving average done
clear
C)
Variance analysis done
clear
D)
Weighted moving average. done
clear
View Solution play_arrow
-
question_answer113)
For a product, the forecast for the month of January was 500 units. The actual demand turned out to he 450 units. What is the forecast for the month of February using exponential smoothing method with a smoothing coefficient\[=0.1\]?
A)
455 done
clear
B)
495 done
clear
C)
500 done
clear
D)
545 done
clear
View Solution play_arrow
-
question_answer114)
Match List-I (Activity) with List-II (Technique) and select the correct answer using the code given below the lists:
List-I (Activity) | List-II (Technique) |
A. | Line Balancing | 1. | Value Analysis |
B. | Product Development | 2. | Exponential Smoothing |
C. | Forecasting | 3. | Control Chart |
D. | Quality Control | 4. | Selective Control |
| 5. | Rank positive Matrix |
Codes:
A)
A\[\to \]2, B\[\to \]1, C\[\to \]4, D\[\to \]3 done
clear
B)
A\[\to \]5, B\[\to \]3, C\[\to \]2, D\[\to \]1 done
clear
C)
A\[\to \]2, B\[\to \]3, C\[\to \]4, D\[\to \]1 done
clear
D)
A\[\to \]5, B\[\to \]1, C\[\to \]2, D\[\to \]3 done
clear
View Solution play_arrow
-
question_answer115)
What are the key functions of a master schedule?
1. To generate material and capacity requirements |
2. To maintain valid priorities |
3. An effective capacity utilization |
4. Planning the quantity and timing of output over the intermediate time horizons. |
Select the correct answer using the code given below:
A)
1, 2 and 3 done
clear
B)
2, 3 and 4 done
clear
C)
1, 3 and 4 done
clear
D)
1, 2 and 4 done
clear
View Solution play_arrow
-
question_answer116)
Match List-I (Production Control Function) with List-II (Explanation) and-select the correct answer using the code given below the lists:
List-I (Production Control Function) | List-II (Explanation) |
A. | Bill of Materials (BOM) | 1. | A technique for determining the quantity and timing of dependent demand items |
B. | Capacity Resource Planning (CRP) | 2. | A technique for determining personal and equipment capacities needed to meet the production objectives |
C. | Material Requirement Planning(MRP) | 3. | Specific what end items are to be |
D. | Master Production Schedule (MPS) | 4. | The part number and quantity required per assembly |
Codes:
A)
A\[\to \]4, B\[\to \]1, C\[\to \]2, D\[\to \]3 done
clear
B)
A\[\to \]3, B\[\to \]2, C\[\to \]1, D\[\to \]4 done
clear
C)
A\[\to \]4, B\[\to \]2, C\[\to \]1, D\[\to \]3 done
clear
D)
A\[\to \]3, B\[\to \]1, C\[\to \]2, D\[\to \]3 done
clear
View Solution play_arrow
-
question_answer117)
Which one of the following forecasting techniques is most suitable for making long range forecasts?
A)
Time series analysis done
clear
B)
Regression analysis done
clear
C)
Exponential smoothing done
clear
D)
Market surveys done
clear
View Solution play_arrow
-
question_answer118)
The double slider-crank chain is shown in the diagram its three possible inversions. The link shown hatched is the fixed link.

Which one of the following statement is correct?
A)
Inversion (1) is for ellipse trammel and inversion (2) is for Oldham coupling. done
clear
B)
Inversion (1) is for ellipse trammel and inversion (3) is for Oldham coupling. done
clear
C)
Inversion (2) is for ellipse trammel and inversion (3) is for Oldham coupling. done
clear
D)
Inversion (3) is for ellipse trammel and inversion (2) is for Oldham coupling. done
clear
View Solution play_arrow
-
question_answer119)
ABCD is a four bar mechanism, in which AD is the fixed link, and link BC is in the form of a circular disc with centre P. In which one of the following cases P will be the instantaneous centre of the disc?
A)
If it lies on the perpendicular bisector of line BC. done
clear
B)
If it lies on the intersection of the perpendicular bisectors of BC and AD. done
clear
C)
If it lies on the intersection of the perpendicular bisectors of AB and CD. done
clear
D)
If it lies on the intersection of the extensions of AB and CD. done
clear
View Solution play_arrow
-
question_answer120)
In the diagram given below, the magnitude of absolute angular velocity of link 2 is 10 radians per second while that of link 3 is 6 radians per second. What is the angular velocity of link 3 relative to 2?
A)
6 radians per second done
clear
B)
16 radians per second done
clear
C)
4 radians per second done
clear
D)
14 radians per second done
clear
View Solution play_arrow