Railways NTPC (Technical Ability) Production Engineering and Planning Question Bank Production Planning

  • question_answer
    Which of the following factors are to be considered for production scheduling?
    1. Sales forecast            
    2. Component design
    3. Route sheet               
    4. Time standards
    Select the correct answer using the codes given below:
    Codes:

    A) 1, 2 and 3                     

    B) 1, 2 and 4

    C) 1, 3 and 4                     

    D) 2, 3 and 4

    Correct Answer: D


You need to login to perform this action.
You will be redirected in 3 sec spinner