Railways NTPC (Technical Ability) Production Engineering and Planning Question Bank Production Planning

  • question_answer
    Which one of the following correctly explains process capability?

    A) Maximum capacity of the machine

    B) Mean value of the measured variable

    C) Lead time of the process

    D) Maximum deviation of the measured variables of the components

    Correct Answer: D


You need to login to perform this action.
You will be redirected in 3 sec spinner