    Break-even analysis can be used for which of the following?
    1. Profit analysis
    2. Production method cost comparison.
    Select the correct answer using the code given below:

    A) 1 only              

    B) 2 only

    C) Both 1 and 2                 

    D) neither 1 nor 2

    Correct Answer: C