Railways NTPC (Technical Ability) Production Engineering and Planning Question Bank Production Planning

  • question_answer
    Which one of the following is true in respect of production control for continuous or assembly line production?

    A) Control is achieved by PERT network

    B) Johnson algorithm is used for sequencing

    C) Control is on one work centre only

    D) Control is on flow of identical components through several operations.

    Correct Answer: D