Railways NTPC (Technical Ability) Power and Control System Question Bank Control System

  • question_answer
    Type 0 systems are unsuitable ____

    A)  For ramp inputs

    B)  If input is parabolic in nature.

    C)  Both a & b

    D)  None of the above

    Correct Answer: C


You need to login to perform this action.
You will be redirected in 3 sec spinner